When Every Millimeter Counts: Solving a Critical Fitment Issue in 72 Hours

"When a new client in Michigan encountered a fitment challenge with our customized blow bars, Krystal-A acted immediately to ensure seamless installation. Within 24 hours, we assessed the issue; within 48 hours, we were on-site; and within 72 hours, we implemented a tailored solution—preventing any operational disruptions. Discover how our commitment to customer satisfaction and precision engineering delivered a fast, effective resolution."

Client Overview

✔ Client: A new partner operating a high-output aggregate facility in Michigan, USA.​

 

✔ Production Volume: Approximately 17,000 tons of output daily.​

 

✔ Key Equipment: Impact crushers utilizing Krystal-A's customized High Chrome Ceramic Blow Bars.

Challenges Our Client Faced

A Fitment Concern That Needed Immediate Attention

1️⃣ Unexpected Fitment Challenge – During installation, the client discovered that our customized high-manganese blow bars were 1-2mm thicker than their previous OEM parts.

2️⃣ Additional Installation Effort – To make them fit, they had to shave down the mounting shoes, which required more time and effort than expected.

3️⃣ Need for a Resolution for Remaining Blow Bars – Since they had received an entire set of blow bars, they needed a clear and immediate solution to ensure smooth installation for the rest.

4️⃣ Clarification on Future Orders – The client wanted to understand what adjustments Krystal-A would make to prevent this issue in future shipments.

Krystal-A’s Immediate Response: Fast, Precise, and Client-Focused

When our client in Michigan encountered a fitment challenge during the installation of our customized high-manganese blow bars, they immediately reached out for support. The 1-2mm thickness difference required unexpected additional effort, prompting concerns about the remaining blow bars in their shipment and the long-term fitment for future orders.

At Krystal-A, our clients’ operational efficiency is our top priority. Even though this variance fell within standard industry tolerances, we recognized that any installation difficulty is a disruption our client should not have to face.

 

Acting with urgency and precision, we followed our 24-48-72 response framework to ensure the issue was resolved effectively and without production delays:

✔ Within 24 Hours: We assessed the reported concern, gathered technical data, and developed an action plan.
✔ Within 48 Hours: Our team arrived on-site to conduct a full diagnostic, evaluate fitment, and collaborate directly with the client’s maintenance team.
✔ Within 72 Hours: We delivered a customized solution, ensuring seamless installation of the remaining blow bars and establishing long-term corrective measures.

Delivering a Long-Term Solution with Precision and Accountability

Once on-site, our priority was to not only address the immediate fitment challenge but to implement a long-term, structured solution that would prevent similar concerns in future shipments. To achieve this, Krystal-A took the following steps:

Collaborated with a trusted local workshop to manufacture customized container shoes, ensuring a precise fit for the remaining blow bars in the client’s shipment.
Absorbed all costs related to the modifications, reinforcing our commitment to product excellence and customer satisfaction.
Conducted on-site installation testing to confirm that the adjusted components performed seamlessly under operational conditions.

Beyond solving the immediate issue, we implemented preventive measures to enhance future product reliability and fitment accuracy:

Provided real-time feedback to our foundry team, ensuring tighter tolerances in subsequent production runs.
Enhanced our internal quality control processes, adding additional fitment verification checkpoints before shipment.
Scheduled post-resolution follow-ups to gather client feedback, monitor part performance, and ensure continued operational efficiency.

Final Outcome

🔹 Before Krystal-A’s Solution:
Extra installation effort required, as the client had to modify container shoes.
Concerns about fitment for remaining blow bars, creating uncertainty.
No guarantee that future shipments would meet exact specifications.

🔹 After Krystal-A’s Solution:
✔️ Seamless installation of all remaining blow bars—no further modifications needed.
✔️ Enhanced quality control for future shipments, ensuring precise fitment.
✔️ Stronger client confidence in Krystal-A’s responsiveness and reliability.

A Partner Who Stands by You

"At Krystal-A, we go beyond supplying wear parts—we stand behind them. When a client faces a challenge, we respond with urgency, technical expertise, and an unwavering commitment to operational success. Our 24-hour response time, 48-hour on-site diagnostics, and 72-hour tailored solutions ensure that our clients always have the support they need to keep their crushers running at peak efficiency. And when we commit to a solution, we deliver—on time, every time."

Worldwide Distribution

Covering mostly North America, Australia, New Zealand, and Europe

Contact Us

Address

2029 Las Lomitas Drive, Hacienda Heights, California 91745

Open: 7:00 am-5:00 pm, Mon-Fri

Phone: +1(626)-606-8599

Email: info@krystal-a.com

        Krystal-A Industries

Krystal-A Industries

Copyright © 2024 Krystal-A Industries Inc 2024. All rights reserved.

Stay in Tune,
Subscribe to Our Newsletter

Thank you for subscribing!

bottom of page